Abstract

Construction machinery (CM) is widely used in engineering construction projects, and the completion of the project is inseparable from the role of CM. However, generally speaking, the construction period of a project is very long, and it is inevitable that various problems with machinery and equipment will cause construction accidents, so it is necessary to identify CM construction safety risks through risk to ensure construction quality and keep up with the construction schedule. In this regard, this paper studies the risk factors triggering CM construction safety accidents, constructs an evaluation index system applicable to CM construction risks, calculates the weight of the impact indicators using the fuzzy comprehensive evaluation method of artificial intelligence(AI) algorithm, and assigns points to each indicator risk through experts. The paper also concludes with a risk control strategy and management mechanism for CM construction, which provides a basis for staff to make safety risk decisions.

Keywords

Artificial Intelligence Algorithm, Fuzzy Comprehensive Evaluation, Construction Machinery, Construction Risk

Cite This Paper

Mathea Wojciech. Construction Machinery Construction Risk Assessment Based on Artificial Intelligence Algorithm. Kinetic Mechanical Engineering (2021), Vol. 2, Issue 2: 1-8. https://doi.org/10.38007/KME.2021.020201.

References

[1] Vm A, Shao Z B, Tlkr B. Early construction cost and time risk assessment and evaluation of large-scale underground cavern construction projects in Singapore -ScienceDirect. Underground Space, 2020, 5(1):53-70. https://doi.org/10.1016/j.undsp.2018.10.002

[2] Amarasinghe I A, Hadiwattege C. Enablers for facilitating life cycle assessment: key stakeholder perspectives of Sri Lankan construction industry. Built Environment Project and Asset Management, 2021, 12(4):590-612. https://doi.org/10.1108/BEPAM-02-2021-0033

[3] Didehkhani H, Khalili-Damghani K, Farahani A F, et al. A framework for interactive risk assessment in projects: case study of oil and gas megaprojects in presence of sanctions. Journal of Modelling in Management, 2021, 17(2):569-600.https://doi.org/10.1108/JM2-07-2020-0180

[4] Kayhan B M, Cebi S, Kahraman C. Determining and Prioritizing Main Factors of Supplier Reliability in Construction Industry. Journal of multiple-valued logic and soft computing, 2019, 32(1-2):111-134.

[5] Me A, Af A, Mf B, et al. Hybridization of AI models with nature inspired optimization algorithms for lake water level prediction and uncertainty analysis - Science Direct. Alexandria Engineering Journal, 2021, 60( 2):2193-2208. https://doi.org/10.1016/j.aej.2020.12.034

[6] Jones W, Gibb A, Goodier C, et al. Nanomaterials in construction-what is being used, and where?. Construction materisls, 2019, 172(CM2):49-62. https://doi.org/10.1680/jcoma.16.00011

[7] Karimi T, Yahyazade Y. Developing a risk assessment model for banking software development projects based on rough-grey set theory. Grey Systems: Theory and Application, 2021, 12(3):574-594. https://doi.org/10.1108/GS-05-2021-0074

[8] Getuli V, Sorbi T, Bruttini A, et al. A smart objects library for BIM-based construction site and emergency management to support mobile VR safety training experiences. Construction Innovation, 2021, 22(3):504-530. https://doi.org/10.1108/CI-04-2021-0062

[9] Fazeli A, Mohandes S R, Hajirasouli A, et al. Augmented reality in design and construction: thematic analysis and conceptual frameworks. Construction Innovation, 2021, 22(3):412-443.

[10] Lau C K, Chen H. Stakeholder perceptions on the risk factors, challenges and benefits of business sustainability practices in the Singapore construction industry. Property Management, 2021, 40(2):149-168. https://doi.org/10.1108/PM-02-2021-0014

[11] Oyegoke A S, Powell R, Ajayi S, et al. Factors affecting the selection of effective cost control techniques in the UK construction industry. Journal of Financial Management of Property and Construction, 2021, 27(2):141-160. https://doi.org/10.1108/JFMPC-07-2020-0050

[12] Mustaniroh S A, Radyarini D, Silalahi R. Supply Chain Risk Mitigation of Enting Geti with Fuzzy Failure Mode and Effect Analysis and Analytical Hierarchy Process (Case Study at Small Medium Enterprises of Kuda Terbang, Blitar District, East Java Province, Indonesia). Advance journal of food science and technology, 2019, 17(2):18-27. https://doi.org/10.19026/ajfst.17.5998

[13] Dhandapani K. Systematic Approach to the Reliability Characterization of System-in-Package (SiP). Advancing Microelectronics, 2019, 46(3):6-11.

[14] Wenceslao Rodríguez, Marquina M, Mazzeo I, et al. Quality assurance and new public management: transformations in organizational structures, functions and roles in Argentine universities. Quality Assurance in Education, 2021, 30(3):352-369. https://doi.org/10.1108/QAE-10-2021-0160

[15] Lau C, Li Y. Making or remaking people and places through festivals: an island tourism perspective. International Journal of Event and Festival Management, 2021, 13(3):249-266. https://doi.org/10.1108/IJEFM-10-2021-0078

[16] Silvia Inês Dallavalle Pádua, Bernardo R, Nogueira C A. A map for the holistic BPM diagnosis. Business Process Management Journal, 2021, 28(3):630-655. https://doi.org/10.1108/BPMJ-04-2021-0197

[17] Leeks A. Jkc Australia Lng Pty Ltd V Inpex Operations Australia Pty Ltd. Building & Construction Law, 2019, 34(5):405-418.

[18] Br A, Ms A, Xtf B. Ground behaviour analysis, support system design and construction strategies in deep hard rock mining - Justified in Western Australian's mines - ScienceDirect. Journal of Rock Mechanics and Geotechnical Engineering, 2020, 12(1):1-20. https://doi.org/10.1016/j.jrmge.2019.01.006

[19] Hocke K. Gulf Island begins construction on second research vessel. Work Boat, 2019, 76(7):27-28.