Welcome to Scholar Publishing Group

International Journal of Big Data Intelligent Technology, 2024, 5(1); doi: 10.38007/IJBDIT.2024.050117.

Research on the Evaluation of Vertical Curvature Line Shape for Ballastless Track Laying on a 420m Extra-large Span Double-track Truss Strengthened PC Box Girder Cable-stayed Bridge

Author(s)

Jun Gao, Hongxiong Lu, Zhongxi Guo, Zhiguo Liu, Chan Mei, Jian Zhang

Corresponding Author:
Jun Gao
Affiliation(s)

Wuhan University of Technology, Wuhan 430017, Hubei, China

Wujiu Railway Passenger Dedicated Line Hubei Co., Ltd., Wuhan 430012, Hubei, China

Inner Mongolia Autonomous Region Department of Transportation, Hohhot 010020, Inner Mongolia, China

Wuhan-Guangzhou Railway Passenger Dedicated Line Co Ltd., Wuhan 430012, Hubei, China

Abstract

Laying ballastless tracks on long-span bridges has always been a technical challenge in bridge and track engineering. Tall piers and long spans a series of characteristics such as large structural weight, large deformation, and large beam end rotation angles. Under the action of train loads, temperature loads, creep, other loads, the deformation is complex, making it difficult to maintain track smoothness. With the continuous in-depth research and development of ballastless track technology on-span bridges, laying ballastless tracks on long-span bridges and achieving high-speed operation has become the main technical breakthrough. The 60m chord measurement method the evaluation method of the vertical deformation radius of the mid-span vertical curve are used to assess the smoothness of the track surface, and the applicability of layingastless tracks on a 420m double-track steel truss reinforced PC box girder cable-stayed bridge is concluded. This has important reference significance the study of related engineering problems.

Keywords

420m double-track steel truss; cable-stayed bridge; ballastless track; vertical curvature radius; line shape evaluation

Cite This Paper

Jun Gao, Hongxiong Lu, Zhongxi Guo, Zhiguo Liu, Chan Mei, Jian Zhang. Research on the Evaluation of Vertical Curvature Line Shape for Ballastless Track Laying on a 420m Extra-large Span Double-track Truss Strengthened PC Box Girder Cable-stayed Bridge. International Journal of Big Data Intelligent Technology (2024), Vol. 5, Issue 1: 161-171. https://doi.org/10.38007/IJBDIT.2024.050117.

References

[1] Chen S, Tang S, Zhang G, et al. Long-term performance test concrete cable-stayed bridges[J]. China Journal of Highway and Transport, 2011, 24(4): 39-49.

[2] Bentaleb F, Amara I. Modeling of Cutting Forces and Roughness by the Response Surface Method (RSM)[M]. Berlin: Springer Publishing, 2015.

[3] Zhang Y, Meng S. Long-term deformation prediction of large-span continuous rigid frame bridges based on response surface[J]. China Civil Engineering Journal, 2011, 44(8): 102-106. 

[4] Ma K Xiang T, Zhao R, et al. Stochastic analysis of long-term deformation of high-speed railway reinforced concrete arch bridges[J]. China Civil Engineering Journal,2012, 45(11): 141-146.

[5] Wu Y. Study on long-term deformation stress stochastic analysis of high-speed railway large-span continuous rigid frame bridges[D]. Chengdu: Southwest Jiaotong University, 2014. 

[6] Wang M. Stochastic analysis of long-term deformation of large-span prestressed concrete continuous rigid frame bridges[D]. Chengdu: Southwest Jiaotong University 2014. 

[7] Xin J, Zhou J, Yang Y, et al. Application of response surface method in long-term deformation prediction of main of large-span rail cable-stayed bridges[J]. Journal of Jiangsu University (Natural Science Edition), 2016, 37(3):367-372. 

[8] Jeffcoat M. The effect of experimental design parameters on the determination of sample size[J]. Journal of Periodal Research, 2010, 27(4): 320-322. 

[9] Ye C, He S Hou Y. Design of simple axial tensile testing instrument and experimental study of reasonable sample size[J]. Railway Standard Design, 2016, 609): 9-15. 

[10] Liu J, Wang H, Zhang Z, et al. Study on response surface model and optimization algorithm damage identification of cable-stayed bridges[J]. Railway Engineering, 2016, 56(10): 1-5.

[11] Li X, Zhou J, Yang J, et al. Analysis of static live load pre-camber setting for large-span rail cable-stayed bridges based on characteristics[J]. Science and Technology Engineering, 2016, 16(6): 222-227.

[12] J, Wang D. Sensitivity analysis of static parameters of large-span cable-stayed bridges based on response surface method[J]. Highway and Transport Science and Technology,2015, 32(8): 100-106.

[13] Wang D, Tang H. Static system of cable-stayed bridges based on response surface method[J]. Journal of Transportation Science and Engineering, 2014, 30(2): 4-39. 

[14] Guan H, Shangguan X. Stochastic analysis of construction errors in concrete cable-stayed bridges[J China Journal of Highway and Transport, 2013, 33(1): 159-163. 

[15] Yu, Wu Y, Su X. Study on shape optimization prediction of large-span concrete cable-stayed bridges[J]. Journal of Railway Science and Engineering, 208, 15(1): 133-140. 

[16] Yu S, Zhou L, Ou J. Finite element correction of ultra-large span suspension bridges based on radial basis function response surface method[J]. Journal of Railway Science and Engineering, 2014, 1(1): 1-9

[17] Xie M, Bu Y, Zhang K, et al. Sensitivity analysis of geometric control parameters of-large span hybrid beam cable-stayed bridges[J]. Journal of Chang'an University (Natural Science Edition), 2014, 34(3):66-73.

[18] Wang Shengwu, Xiang Chunfu, Li Tengteng, et al. Parametric sensitivity analysis of an single-tower cable-stayed bridge[J]. Highway Engineering, 2015, 40(1):137-14.

[19] Liang Zongbao. Research on Bridge Structural Safety Evaluation Based on Monitoring Information Statistical Analysis [D]. Chqing: Chongqing University, 2006.