International Journal of Engineering Technology and Construction, 2024, 5(1); doi: 10.38007/IJETC.2024.050109.

The Application of BIM in the Whole Life Cycle Management of Subway Projects

Author(s)

Haidong Jiang

Corresponding Author:
Haidong Jiang
Affiliation(s)

Institute of Resources and Environmental Engineering, Guizhou Institute of Technology, Guiyang 550003, Guizhou, China

Abstract

In the current management of subway projects, problems such as information islands, poor communication and waste of resources are often faced, which seriously affect the efficiency and quality of the project. In order to solve these problems, this paper aims to study the application of building information modeling (BIM) in the full life cycle management of subway projects. This paper first establishes a BIM model to integrate the design, construction and operation information of the project. Secondly, BIM technology is used for collision detection and collaborative design to ensure real-time sharing of information between various disciplines. Then, BIM is used to visualize the construction progress and optimize resource allocation. Finally, BIM is used for operation and maintenance management and digital archives are established. The research results show that by applying BIM technology, the construction period of subway projects is as low as 33 days and the resource utilization rate is as high as 72%. The application of BIM technology in the full life cycle management of subway projects has significantly improved the efficiency and coordination of the project, and provided a management model for future subway construction.

Keywords

BIM; Subway Project; Full Life Cycle Management; Collision Detection

Cite This Paper

Haidong Jiang. The Application of BIM in the Whole Life Cycle Management of Subway Projects . International Journal of Engineering Technology and Construction (2024), Vol. 5, Issue 1: 78-86. https://doi.org/10.38007/IJETC.2024.050109.

References

[1]Li Xiaofeng, Wang Li, Luan Chengzhi, Yu Qiuyan, Jie Jianhua, Luo Chengchao. Research on carbon emissions over the entire life cycle based on actual subway lines[J]. Urban Rapid Rail Transit, 2024, 37(1): 82-87.

[2]Zhen Jian. Construction and application of BIM digital platform for the entire life cycle of Wuhan Metro[J]. Modern Information Technology, 2024, 8(10): 149-155.

[3]Shen Tianliang, Zuo Liang, Zhu Tao, Wang Chao, Xiao Shoune, Yang Guangwu, Zhang Bing. Service life assessment of aluminum alloy car body for subway vehicles based on the whole life cycle[J]. Electric Locomotive & Urban Mass Transit Vehicles, 2023, 46(6): 101-106.

[4]Su Baohang. Research on operation control strategy during the design life cycle of subway projects[J]. Modern Engineering Science and Technology, 2023, 2(15): 125-128.

[5]Luo Lina, Wang Nan, Huang Jinpeng, Luo Wenqing. Safety monitoring scheme for subway projects based on the whole life cycle[J]. Science, Technology and Industry, 2024, 24(15): 143-147.

[6]Zhang N, Zhang H, Schiller G, et al. Unraveling the global warming mitigation potential from recycling subway‐related excavated soil and rock in China via life cycle assessment[J]. Integrated Environmental Assessment and Management, 2021, 17(3): 639-650.

[7]Zhang S, Sunindijo R Y, Loosemore M, et al. Identifying critical factors influencing the safety of Chinese subway construction projects[J]. Engineering, Construction and Architectural Management, 2021, 28(7): 1863-1886.

[8]Ghanbaripour A N, Sher W, Yousefi A. Critical success factors for subway construction projects–main contractors’ perspectives[J]. International Journal of Construction Management, 2020, 20(3): 177-195.

[9]Liu L, Wu H, Wang J, et al. Research on the evaluation of the resilience of subway station projects to waterlogging disasters based on the projection pursuit model[J]. Mathematical biosciences and engineering, 2020, 17(6): 7302-7331.

[10]Luo Z, Guo J, Han J, et al. Research on the construction safety risk assessment of prefabricated subway stations in China[J]. Engineering, Construction and Architectural Management, 2024, 31(4): 1751-1787.

[11]Pan Y, Zhang L. Integrating BIM and AI for smart construction management: Current status and future directions[J]. Archives of Computational Methods in Engineering, 2023, 30(2): 1081-1110.

[12]Disney O, Roupé M, Johansson M, et al. Embracing BIM in its totality: a Total BIM case study[J]. Smart and Sustainable Built Environment, 2022, 13(3): 512-531.

[13]Abdumutalibovich K A, Lutfillaevna B M. The Role of Bim Technologies in the Information System of Education[J]. Journal of Contemporary Business Law & Technology: Cyber Law, Blockchain, and Legal Innovations, 2024, 1(2): 9-13.

[14]Van Tam N, Quoc Toan N, Phong V V, et al. Impact of BIM-related factors affecting construction project performance[J]. International Journal of Building Pathology and Adaptation, 2023, 41(2): 454-475.

[15]Al-Mohammad M S, Haron A T, Esa M, et al. Factors affecting BIM implementation: Evidence from countries with different income levels[J]. Construction Innovation, 2022, 23(3): 683-710.